What can you build in New Canaan, CT?
New Canaan, CT follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.
Eligibility
- –Internal / Attached ADU: By Right
- –Detached ADU: Special Permit
Interior / Attached ADU Size Limits
- –Maximum internal or attached ADU size of 1,000 sq ft
- –Maximum internal or attached ADU size equal to 40% of combined floors (equivalently two thirds of the principal dwelling floor area)
Owner Occupancy
- –Owner must occupy either the principal or the ADU
Parking
- –3 spaces per lot with an ADU (2 for principal + 1 for ADU); parking must serve both units together and cannot be in the front yard; no off-street parking required in Retail A Zone if permitted.
Rental Restrictions
- –Short-term rentals restricted to <30 consecutive nights; max three lease instances per rolling six months; only one STR unit per property; permits required; on-site parking; non-lodging/event uses prohibited
ADU State Law
What can you build in Connecticut?
- –Connecticut Public Act 21-29 (now CGS § 8-2o) established statewide ADU rules.
- –115 municipalities opted out of the state ADU provisions. In those towns, ADUs may still be allowed, but they are regulated solely under local zoning bylaws.
- –54 municipalities did not opt out and are subject to the state's default ADU standards. Local bylaws in these towns must allow at least the minimums required by state law.
- –At least one accessory apartment must be allowed as of right on any lot with a single-family home.
- –Towns must allow an ADU to be at least the lesser of 1,000 sq ft or 30% of the principal dwelling's Net Floor Area.
- –Setbacks, lot size, building frontage, lot coverage, height, and design requirements cannot be more restrictive than those applied to the principal dwelling.
- –Only one parking space can be required per ADU.
- –A passageway between units
- –A separate exterior entrance (unless required by code)
- –A relationship (e.g. familial or employment) between occupants
- –Age minimums for ADU tenants
- –Separate utility billing
- –Periodic permit renewals
- –Owner-occupancy is not required under state law, but towns may impose it.
- –Towns may regulate short-term rentals.
- –Requirements for wells or private sewerage systems still apply, but approval cannot be unreasonably withheld.
- –Towns may not condition ADU approval on fixing unrelated nonconformities on the lot.
- –No new utility connection fees may be charged unless the ADU is built with a new principal dwelling.
What's allowed on your lot?
These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.
Check my propertyHow can we help you?
Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs
Is your property eligible for an ADU?
ADU rules in other Connecticut municipalities
Rules change at the town line. Check the municipality your property is actually in.
Western Connecticut County