FutureLot
ADUs are allowed in Goshen
Types:DetachedInternal

Accessory Dwelling Unit (ADU) Rules for Goshen, CT

Is your property eligible for an ADU?

# of Properties
2,038
Owner-occupied
46%
Zoning districts
8
Avg Home Value
$482,222
Median Lot Size
1.15 acres
Avg Income
$172,655
Residential Types:
2,038 housing units
Single Family
82%
Other
18%
Zoning Districts:
2,316 parcels · 8 districts
RA-5
51%(1,170)
WL
34%(781)
RA-2
12%(286)
RA-1
3%(59)
Other
1%(20)

ADU Rules

What can you build in Goshen, CT?

Goshen, CT follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.

Interior / Attached ADU Size Limits

  • Maximum size of 50% of the floor area of the original dwelling unit

Detached ADU Size Limits

  • Maximum size is the lesser of 1200 sq ft or 50% of the floor area of the principal residential structure

Max Units

  • Single-family: 1 ADU/lot (attached/internal or in an existing accessory building).
  • RR Zone: 0 ADUs.

Owner Occupancy

  • One of the two dwelling units must be owner-occupied.

Parking

  • No ADU-specific standard; Commission sets spaces case-by-case; reductions/reserve parking possible.

ADU State Law

What can you build in Connecticut?

  • Connecticut Public Act 21-29 (now CGS § 8-2o) established statewide ADU rules.
  • 115 municipalities opted out of the state ADU provisions. In those towns, ADUs may still be allowed, but they are regulated solely under local zoning bylaws.
  • 54 municipalities did not opt out and are subject to the state's default ADU standards. Local bylaws in these towns must allow at least the minimums required by state law.
  • At least one accessory apartment must be allowed as of right on any lot with a single-family home.
  • Towns must allow an ADU to be at least the lesser of 1,000 sq ft or 30% of the principal dwelling's Net Floor Area.
  • Setbacks, lot size, building frontage, lot coverage, height, and design requirements cannot be more restrictive than those applied to the principal dwelling.
  • Only one parking space can be required per ADU.
  • A passageway between units
  • A separate exterior entrance (unless required by code)
  • A relationship (e.g. familial or employment) between occupants
  • Age minimums for ADU tenants
  • Separate utility billing
  • Periodic permit renewals
  • Owner-occupancy is not required under state law, but towns may impose it.
  • Towns may regulate short-term rentals.
  • Requirements for wells or private sewerage systems still apply, but approval cannot be unreasonably withheld.
  • Towns may not condition ADU approval on fixing unrelated nonconformities on the lot.
  • No new utility connection fees may be charged unless the ADU is built with a new principal dwelling.

What's allowed on your lot?

These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.

Check my property

How can we help you?

Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs

Is your property eligible for an ADU?

ADU rules in other Connecticut municipalities

Rules change at the town line. Check the municipality your property is actually in.

Northwest Hills County