FutureLot
ADUs are allowed in Montague
Types:DetachedInternal

Accessory Dwelling Unit (ADU) Rules for Montague, CA

Is your property eligible for an ADU?

# of Properties
660
Owner-occupied
31%
Zoning districts
12
Avg Home Value
$104,775
Median Lot Size
0.26 acres
Avg Income
$59,726
Residential Types:
660 housing units
Single Family
64%
2-3 Family
2%
Apts (4+ units)
3%
Other
30%
Zoning Districts:
124 parcels · 12 districts
AG-2-B-40
34%(42)
R-R-B-2.5
19%(23)
R-R
12%(15)
AG-1
10%(12)
Other
26%(32)

ADU Rules

What can you build in Montague, CA?

Montague, CA follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.

Interior / Attached ADU Size Limits

  • Maximum size: 1,000 sq ft on lots of 10,000 sq ft or more; otherwise 850 sq ft for a studio/one-bedroom or 1,000 sq ft for two or more bedrooms.

Detached ADU Size Limits

  • Maximum 1,000 sq ft on lots 10,000 sq ft or larger; otherwise 850 sq ft for a studio or one-bedroom, or 1,000 sq ft for an ADU with more than one bedroom.

Max Units

  • Single-family: 1 ADU + 1 JADU per lot
  • Multifamily: 2 detached ADUs per parcel
  • Multifamily (within existing structures not used as livable space): up to 25% of units (min 1)

Owner Occupancy

  • After Jan 1, 2025, owner must occupy primary or ADU

Parking

  • 0 spaces under conditions: within 0.5 mi of transit, in a designated historic district, created within the existing primary residence or an existing accessory structure, or where street parking permits aren’t offered to the ADU or a car-share is within one block; otherwise, 1 space per ADU or per bedroom (whichever is less)

Rental Restrictions

  • Short-term rentals (<30 days) prohibited; rentals must be 30+ days

ADU State Law

What can you build in California?

  • Cannot bar a 150 sq ft Efficiency Unit.
  • Local caps may not be lower than 850 sf (1 BR) or 1 000 sf (2+ BR).
  • must always allow one 800 sf detached ADU with By-Right Permitting – Every city and county must process ADU and JADU applications ministerially; no public hearing or CEQA review.
  • once the application is deemed complete, the jurisdiction has 60 calendar days to issue or deny or it's automatically approved.
  • Single-family lots: at least 1 internal/attached ADU + 1 JADU + 1 detached ADU.
  • Multifamily lots: ≥ 1 (up to 25 % of existing units) made from interior conversions and 2 detached ADUs (existing buildings) or up to 8 detached ADUs total (SB 1211, 2025).
  • ADU (Accessory Dwelling Unit): may be detached, attached, or internal; fully independent with its own bathroom and full kitchen; no owner-occupancy requirement.
  • JADU (Junior ADU): max 500 sf, carved from within the existing single-family home; kitchenette allowed and bathroom may be shared; owner of the property must occupy either the JADU or the main house.
  • 4-ft side/rear setbacks.
  • 16 ft base; 18 ft within ½-mile of a Major Transit Stop/HQTC or on a lot with a multistory house; +2 ft to match roof pitch (max 20 ft).
  • Side/rear setbacks can't exceed 4 ft; front-yard placement must be allowed somewhere on the lot if needed to fit the 800 sf default unit.
  • ADUs are legal in every residential zone.
  • Exempt from local lot-coverage, FAR, bedroom caps, aesthetic design rules, etc., if those rules would block the 800 sf / 4-ft-setback unit.
  • Cities may adopt friendlier standards but not stricter ones; if they adopt none, state rules apply by default.
  • Impact fees: forbidden for units < 750 sf; proportional for larger units.
  • Fire sprinklers: not required when the primary dwelling lacks them.
  • Connection fees / capacity charges: must be proportional to fixture counts.
  • No spaces required when the ADU is: • within ½-mile walk of transit • in an historic district • wholly inside the main building • in a car-share area • replacing a garage/carport being converted.
  • No replacement parking may be demanded for a garage conversion.
  • Owner-occupancy cannot be required for ADUs. It is still required for JADUs.
  • Cities may limit short-term rentals (< 30 days).
  • No statewide bedroom limit.
  • Cities that pass an ordinance under AB 1033 may allow the ADU to be sold separately as a condo; otherwise ADU and main home must remain on one lot.
  • Home-owner associations cannot unreasonably bar ADUs/JADUs (Civil Code § 4751).
  • Building-code upgrades (Chapter 7A) apply in mapped Fire-Hazard Severity Zones and the Wildland–Urban Interface.
  • State ADU rights still apply, but a Coastal Development Permit is needed unless the project is an interior conversion with no added floor area.
  • After a lot is split, each new parcel is limited to two total units (e.g., primary + ADU/JADU), not the full stack above.
  • By Jan 1 2025 every city and county must publish a free library of pre-approved ADU plan sets (AB 1332).
  • State ADU law doesn't override private park rules or recorded easements; check title/park covenants case-by-case.

What's allowed on your lot?

These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.

Check my property

How can we help you?

Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs

Is your property eligible for an ADU?

ADU rules in other California municipalities

Rules change at the town line. Check the municipality your property is actually in.

Siskiyou County

Browse addresses by ZIP in Montague