

ADUs are allowed in Unincorporated SacramentoTypes:DetachedInternal
Types:DetachedInternal
Accessory Dwelling Unit (ADU) Rules for Unincorporated Sacramento, CA
Is your property eligible for an ADU?
# of Properties
21,798
Owner-occupied
52%
Zoning districts
61
Avg Home Value
$346,090
Median Lot Size
0.21 acres
Avg Income
$101,493
Residential Types:
21,798 housing units
Single Family
44%
Apts (4+ units)
3%
Other
52%
Zoning Districts:
188,106 parcels · 61 districts
RD-5
49%(91,457)
RD-7
7%(13,430)
SPA
6%(10,525)
RD-10
6%(10,370)
Other
33%(62,324)
ADU Rules
What can you build in Unincorporated Sacramento, CA?
Unincorporated Sacramento, CA follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.
Eligibility
- –Internal / Attached ADU: By Right
- –Detached ADU: By Right
Detached ADU Size Limits
- –Maximum size of 1,200 sq ft for a new detached ADU
Owner Occupancy
- –ADUs do not require owner-occupancy in any zoning district.
Parking
- –1 space/ADU; exemptions: within 0.5 mile of transit, historic district, part of the primary residence or existing accessory structure, street-permit requirements but not offered to ADU occupants, or car share within 1 block; waiver applies only to the ADU when permitted with a new primary or multifamily dwelling; when a garage/carport/covered parking is demolished or converted for an ADU, no replacement parking is required and may be located anywhere on the same lot.
Rental Restrictions
- –Short-term rentals prohibited for ADUs (30 days or less); pre-2020 ADUs may be used for STR only if legally permitted before 1/1/2020, subject to countywide STR rules (permit required; max 29 days per stay).
ADU State Law
What can you build in California?
- –Cannot bar a 150 sq ft Efficiency Unit.
- –Local caps may not be lower than 850 sf (1 BR) or 1 000 sf (2+ BR).
- –must always allow one 800 sf detached ADU with By-Right Permitting – Every city and county must process ADU and JADU applications ministerially; no public hearing or CEQA review.
- –once the application is deemed complete, the jurisdiction has 60 calendar days to issue or deny or it's automatically approved.
- –Single-family lots: at least 1 internal/attached ADU + 1 JADU + 1 detached ADU.
- –Multifamily lots: ≥ 1 (up to 25 % of existing units) made from interior conversions and 2 detached ADUs (existing buildings) or up to 8 detached ADUs total (SB 1211, 2025).
- –ADU (Accessory Dwelling Unit): may be detached, attached, or internal; fully independent with its own bathroom and full kitchen; no owner-occupancy requirement.
- –JADU (Junior ADU): max 500 sf, carved from within the existing single-family home; kitchenette allowed and bathroom may be shared; owner of the property must occupy either the JADU or the main house.
- –4-ft side/rear setbacks.
- –16 ft base; 18 ft within ½-mile of a Major Transit Stop/HQTC or on a lot with a multistory house; +2 ft to match roof pitch (max 20 ft).
- –Side/rear setbacks can't exceed 4 ft; front-yard placement must be allowed somewhere on the lot if needed to fit the 800 sf default unit.
- –ADUs are legal in every residential zone.
- –Exempt from local lot-coverage, FAR, bedroom caps, aesthetic design rules, etc., if those rules would block the 800 sf / 4-ft-setback unit.
- –Cities may adopt friendlier standards but not stricter ones; if they adopt none, state rules apply by default.
- –Impact fees: forbidden for units < 750 sf; proportional for larger units.
- –Fire sprinklers: not required when the primary dwelling lacks them.
- –Connection fees / capacity charges: must be proportional to fixture counts.
- –No spaces required when the ADU is: • within ½-mile walk of transit • in an historic district • wholly inside the main building • in a car-share area • replacing a garage/carport being converted.
- –No replacement parking may be demanded for a garage conversion.
- –Owner-occupancy cannot be required for ADUs. It is still required for JADUs.
- –Cities may limit short-term rentals (< 30 days).
- –No statewide bedroom limit.
- –Cities that pass an ordinance under AB 1033 may allow the ADU to be sold separately as a condo; otherwise ADU and main home must remain on one lot.
- –Home-owner associations cannot unreasonably bar ADUs/JADUs (Civil Code § 4751).
- –Building-code upgrades (Chapter 7A) apply in mapped Fire-Hazard Severity Zones and the Wildland–Urban Interface.
- –State ADU rights still apply, but a Coastal Development Permit is needed unless the project is an interior conversion with no added floor area.
- –After a lot is split, each new parcel is limited to two total units (e.g., primary + ADU/JADU), not the full stack above.
- –By Jan 1 2025 every city and county must publish a free library of pre-approved ADU plan sets (AB 1332).
- –State ADU law doesn't override private park rules or recorded easements; check title/park covenants case-by-case.
What's allowed on your lot?
These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.
Check my propertyHow can we help you?
Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs
Is your property eligible for an ADU?
ADU rules in other California municipalities
Rules change at the town line. Check the municipality your property is actually in.
Sacramento County
Browse addresses by ZIP in Unincorporated Sacramento
9560818,665 addresses9582816,436 addresses9562815,660 addresses9584313,940 addresses9582911,857 addresses9566211,302 addresses958219,068 addresses956608,954 addresses958648,749 addresses958428,698 addresses958268,554 addresses958255,790 addresses958415,239 addresses956735,068 addresses958234,607 addresses956703,425 addresses956833,287 addresses958243,218 addresses958272,693 addresses956932,391 addresses956261,839 addresses958201,639 addresses956321,484 addresses956551,305 addresses