ADUs are allowed in Hidden HillsTypes:DetachedInternal
Types:DetachedInternal
Accessory Dwelling Unit (ADU) Rules for Hidden Hills, CA
Is your property eligible for an ADU?
# of Properties
741
Owner-occupied
70%
Zoning districts
17
Avg Home Value
$4,436,739
Median Lot Size
1.21 acres
Avg Income
$250,001
Residential Types:
741 housing units
Single Family
98%
Other
2%
Zoning Districts:
914 parcels · 17 districts
RA-S
77%(705)
RE11-1
11%(102)
RA-S-2
6%(55)
C-U
1%(13)
Other
4%(39)
ADU Rules
What can you build in Hidden Hills, CA?
Hidden Hills, CA follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.
Eligibility
- –Internal / Attached ADU: By Right
- –Detached ADU: By Right
Interior / Attached ADU Size Limits
- –Maximum attached/internal ADU size is 1,200 sq ft citywide, increased to 1,500 sq ft in the RA-S-2 zone.
Detached ADU Size Limits
- –Maximum detached ADU size of 1,200 sq ft citywide; 1,500 sq ft in RA-S-2.
Max Units
- –Single-family: 1 ADU per lot; 1 JADU per lot within the single-family dwelling; additionally, 1 JADU + 1 detached ADU may be combined on the same lot.
- –Multifamily: Up to 2 detached ADUs per lot; conversion ADUs within the existing multifamily building: at least 1 unit or up to 25% of the existing unit count; JADUs are not permitted on lots with multifamily dwellings.
- –SB 9 urban lot split: On lots created by an SB 9 urban lot split, no more than two residential units total are allowed per lot, inclusive of any ADU or JADU.
Owner Occupancy
- –Owner occupancy required only if a Junior ADU is on the lot
Parking
- –1 space/ADU; none for JADU; waived if within 0.5 mi of transit, in historic district, conversion, no on-street permit for occupant, or car-share within 1 block
Rental Restrictions
- –Short-term rentals (30 days or less) prohibited; rentals must be longer than 30 days.
ADU State Law
What can you build in California?
- –Cannot bar a 150 sq ft Efficiency Unit.
- –Local caps may not be lower than 850 sf (1 BR) or 1 000 sf (2+ BR).
- –must always allow one 800 sf detached ADU with By-Right Permitting – Every city and county must process ADU and JADU applications ministerially; no public hearing or CEQA review.
- –once the application is deemed complete, the jurisdiction has 60 calendar days to issue or deny or it's automatically approved.
- –Single-family lots: at least 1 internal/attached ADU + 1 JADU + 1 detached ADU.
- –Multifamily lots: ≥ 1 (up to 25 % of existing units) made from interior conversions and 2 detached ADUs (existing buildings) or up to 8 detached ADUs total (SB 1211, 2025).
- –ADU (Accessory Dwelling Unit): may be detached, attached, or internal; fully independent with its own bathroom and full kitchen; no owner-occupancy requirement.
- –JADU (Junior ADU): max 500 sf, carved from within the existing single-family home; kitchenette allowed and bathroom may be shared; owner of the property must occupy either the JADU or the main house.
- –4-ft side/rear setbacks.
- –16 ft base; 18 ft within ½-mile of a Major Transit Stop/HQTC or on a lot with a multistory house; +2 ft to match roof pitch (max 20 ft).
- –Side/rear setbacks can't exceed 4 ft; front-yard placement must be allowed somewhere on the lot if needed to fit the 800 sf default unit.
- –ADUs are legal in every residential zone.
- –Exempt from local lot-coverage, FAR, bedroom caps, aesthetic design rules, etc., if those rules would block the 800 sf / 4-ft-setback unit.
- –Cities may adopt friendlier standards but not stricter ones; if they adopt none, state rules apply by default.
- –Impact fees: forbidden for units < 750 sf; proportional for larger units.
- –Fire sprinklers: not required when the primary dwelling lacks them.
- –Connection fees / capacity charges: must be proportional to fixture counts.
- –No spaces required when the ADU is: • within ½-mile walk of transit • in an historic district • wholly inside the main building • in a car-share area • replacing a garage/carport being converted.
- –No replacement parking may be demanded for a garage conversion.
- –Owner-occupancy cannot be required for ADUs. It is still required for JADUs.
- –Cities may limit short-term rentals (< 30 days).
- –No statewide bedroom limit.
- –Cities that pass an ordinance under AB 1033 may allow the ADU to be sold separately as a condo; otherwise ADU and main home must remain on one lot.
- –Home-owner associations cannot unreasonably bar ADUs/JADUs (Civil Code § 4751).
- –Building-code upgrades (Chapter 7A) apply in mapped Fire-Hazard Severity Zones and the Wildland–Urban Interface.
- –State ADU rights still apply, but a Coastal Development Permit is needed unless the project is an interior conversion with no added floor area.
- –After a lot is split, each new parcel is limited to two total units (e.g., primary + ADU/JADU), not the full stack above.
- –By Jan 1 2025 every city and county must publish a free library of pre-approved ADU plan sets (AB 1332).
- –State ADU law doesn't override private park rules or recorded easements; check title/park covenants case-by-case.
What's allowed on your lot?
These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.
Check my propertyHow can we help you?
Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs
Is your property eligible for an ADU?
ADU rules in other California municipalities
Rules change at the town line. Check the municipality your property is actually in.
Los Angeles County