

ADUs are allowed in HerculesTypes:DetachedInternal
Types:DetachedInternal
Accessory Dwelling Unit (ADU) Rules for Hercules, CA
Is your property eligible for an ADU?
# of Properties
3,682
Owner-occupied
80%
Zoning districts
25
Avg Home Value
$497,284
Median Lot Size
0.17 acres
Avg Income
$139,114
Residential Types:
3,682 housing units
Single Family
100%
Zoning Districts:
9,058 parcels · 25 districts
RS-L
48%(4,333)
RM-L
18%(1,599)
RM-M
12%(1,093)
NPP-SAP
9%(840)
Other
13%(1,193)
ADU Rules
What can you build in Hercules, CA?
Hercules, CA follows state and local rules for Accessory Dwelling Units. Here is a concise overview of the local rules.
Eligibility
- –Internal / Attached ADU: By Right
- –Detached ADU: By Right
Interior / Attached ADU Size Limits
- –Internal ADU may be as large as the building’s existing interior floor area, plus up to 150 sq ft for ingress/egress.
- –Attached ADU is limited to 850 sq ft for 1 bedroom or 1,000 sq ft for 2+ bedrooms.
Detached ADU Size Limits
- –Maximum detached ADU size: 850 sq ft for 1 bedroom; 1,000 sq ft for more than 1 bedroom.
Max Units
- –1 ADU per single-family lot (citywide).
- –Statewide exemptions: 1 ADU within existing space; 1 detached ADU up to 800 sq ft may be approved and may pair with 1 JADU; within existing space, 1 ADU + 1 JADU; JADU: 1 per single-family lot.
- –Multifamily: existing buildings: at least 1 ADU and up to 25% of existing units; detached on multifamily lots: not more than 8 or the number of existing units, whichever is less.
Owner Occupancy
- –No owner-occupancy requirement applies to ADUs.
Parking
- –0 spaces for studio; 1 space/ADU for 1+ BR; no max; waivers: transit within 0.5 mi, historic district, within existing residence or existing accessory structure, no ADU parking permits offered, within 1 block of car-share; tandem parking allowed; replacement parking not required.
Rental Restrictions
- –Short-term rentals prohibited; ADUs cannot be rented for less than 30 days (minimum 30-day term).
ADU State Law
What can you build in California?
- –Cannot bar a 150 sq ft Efficiency Unit.
- –Local caps may not be lower than 850 sf (1 BR) or 1 000 sf (2+ BR).
- –must always allow one 800 sf detached ADU with By-Right Permitting – Every city and county must process ADU and JADU applications ministerially; no public hearing or CEQA review.
- –once the application is deemed complete, the jurisdiction has 60 calendar days to issue or deny or it's automatically approved.
- –Single-family lots: at least 1 internal/attached ADU + 1 JADU + 1 detached ADU.
- –Multifamily lots: ≥ 1 (up to 25 % of existing units) made from interior conversions and 2 detached ADUs (existing buildings) or up to 8 detached ADUs total (SB 1211, 2025).
- –ADU (Accessory Dwelling Unit): may be detached, attached, or internal; fully independent with its own bathroom and full kitchen; no owner-occupancy requirement.
- –JADU (Junior ADU): max 500 sf, carved from within the existing single-family home; kitchenette allowed and bathroom may be shared; owner of the property must occupy either the JADU or the main house.
- –4-ft side/rear setbacks.
- –16 ft base; 18 ft within ½-mile of a Major Transit Stop/HQTC or on a lot with a multistory house; +2 ft to match roof pitch (max 20 ft).
- –Side/rear setbacks can't exceed 4 ft; front-yard placement must be allowed somewhere on the lot if needed to fit the 800 sf default unit.
- –ADUs are legal in every residential zone.
- –Exempt from local lot-coverage, FAR, bedroom caps, aesthetic design rules, etc., if those rules would block the 800 sf / 4-ft-setback unit.
- –Cities may adopt friendlier standards but not stricter ones; if they adopt none, state rules apply by default.
- –Impact fees: forbidden for units < 750 sf; proportional for larger units.
- –Fire sprinklers: not required when the primary dwelling lacks them.
- –Connection fees / capacity charges: must be proportional to fixture counts.
- –No spaces required when the ADU is: • within ½-mile walk of transit • in an historic district • wholly inside the main building • in a car-share area • replacing a garage/carport being converted.
- –No replacement parking may be demanded for a garage conversion.
- –Owner-occupancy cannot be required for ADUs. It is still required for JADUs.
- –Cities may limit short-term rentals (< 30 days).
- –No statewide bedroom limit.
- –Cities that pass an ordinance under AB 1033 may allow the ADU to be sold separately as a condo; otherwise ADU and main home must remain on one lot.
- –Home-owner associations cannot unreasonably bar ADUs/JADUs (Civil Code § 4751).
- –Building-code upgrades (Chapter 7A) apply in mapped Fire-Hazard Severity Zones and the Wildland–Urban Interface.
- –State ADU rights still apply, but a Coastal Development Permit is needed unless the project is an interior conversion with no added floor area.
- –After a lot is split, each new parcel is limited to two total units (e.g., primary + ADU/JADU), not the full stack above.
- –By Jan 1 2025 every city and county must publish a free library of pre-approved ADU plan sets (AB 1332).
- –State ADU law doesn't override private park rules or recorded easements; check title/park covenants case-by-case.
What's allowed on your lot?
These are the municipality-wide rules. What's allowed on a specific property also depends on state laws, setbacks, floor area ratio, lot coverage, environmental constraints, topography, and other property-specific factors. Search your address on FutureLot to see what's allowed on your property.
Check my propertyHow can we help you?
Get matched with trusted local builders
Understand what's allowed on your property
Learn the key rules and size limits for ADUs
Is your property eligible for an ADU?
ADU rules in other California municipalities
Rules change at the town line. Check the municipality your property is actually in.
Contra Costa County